Citation: | JIANG Xingchen, WU Yongxia. Risk assessment of excavation dewatering in foundation pits based on NE-BWM and TOPSIS[J]. Journal of Shanghai University of Engineering Science, 2025, 39(1): 65-72. doi: 10.12299/jsues.24-0024 |
[1] |
WU Y X, SHEN S L, LYU H M, et al. Analyses of leakage effect of waterproof curtain during excavation dewatering[J] . Journal of Hydrology,2020,583:124582.
|
[2] |
WU Y X, LYU H M, HAN J, et al. Dewatering-induced building settlement around a deep excavation in soft deposit in Tianjin, China[J] . Journal of Geotechnical and Geoenvironmental Engineering,2019,145(5). DOI: 10.1061/(ASCE)GT.1943-5606.0002045.
|
[3] |
范晓峰. 浅析深基坑开挖过程中可能出现的工程地质问题[J] . 地球,2019(7):89.
|
[4] |
张振中. 基于改进AHP-熵值法的地铁车站深基坑施工风险评估[J] . 现代隧道技术,2022,59(S2):13 − 21.
|
[5] |
张洋. 基于模糊层次综合评价法的城市河道综合整治效果评价[J] . 水利规划与设计,2023(11):79 − 83, 145. doi: 10.3969/j.issn.1672-2469.2023.11.016
|
[6] |
王军. 长江漫滩地区地铁车站基坑降水风险管理研究[D] . 兰州: 兰州交通大学, 2019.
|
[7] |
陶俊. 临河条件下承压水深基坑开挖稳定性与降水风险源分析[D] . 苏州: 苏州科技大学, 2020.
|
[8] |
李曙光, 任少强, 王洪坤, 等. 地铁车站深基坑施工变形规律及安全风险评估[J] . 公路,2022,67(1):355 − 362.
|
[9] |
YUCESAN M, BASHAN V, DEMIREL H, et al. An interval type-2 fuzzy enhanced best-worst method for the evaluation of ship diesel generator failures[J] . Engineering Failure Analysis,2022,138:106428.
|
[10] |
胥明, 许杰, 万友生, 等. 基于CRITIC法与TOPSIS地铁车站施工安全评价[J] . 自然灾害学报,2022,31(3):157 − 166.
|
[11] |
REZAEI J. Best-worst multi-criteria decision-making method[J] . Omega, 2015, 53: 49−57.
|
[12] |
VAFADARNIKJOO A, TAVANA M, BOTELHO T, et al. A neutrosophic enhanced best–worst method for considering decision-makers’ confidence in the best and worst criteria [J] . Annals of Operations Research, 2020, 289: 391−418.
|
[13] |
中华人民共和国住房和城乡建设部. 城市轨道交通地下工程建设风险管理规范: GB 50652—2011[S] . 北京: 中国建筑工业出版社, 2011.
|
[14] |
刘毅, 孙庆文, 刘贵香, 等. 地铁深基坑施工安全评估FDEMATEL-TOPSIS模型及应用[J] . 科学技术与工程,2022,22(10):4253 − 4260. doi: 10.3969/j.issn.1671-1815.2022.10.053
|
[15] |
徐波. 基于逼近理想解排序法的基坑风险模糊识别方法[J] . 地下空间与工程学报,2022,18(2):673 − 680. doi: 10.3969/j.issn.1673-0836.2022.2.dxkj202202037
|
[16] |
辛酉阳, 杨德磊, 方前程. 改进GRA-TOPSIS模型在装配式建筑施工风险评估中的应用[J] . 安全与环境学报,2023,23(7):2212 − 2222.
|