Volume 40 Issue 3
Sep.  2026
Turn off MathJax
Article Contents
HUANG Junhao, LI Zaiwei. Analysis of influence of reinforcement of a rail transit long-span continuous beam bridge on dynamic characteristics of tracks[J]. Journal of Shanghai University of Engineering Science, 2026, 40(3): 249-254. doi: 10.12299/jsues.24-0370
Citation: HUANG Junhao, LI Zaiwei. Analysis of influence of reinforcement of a rail transit long-span continuous beam bridge on dynamic characteristics of tracks[J]. Journal of Shanghai University of Engineering Science, 2026, 40(3): 249-254. doi: 10.12299/jsues.24-0370

Analysis of influence of reinforcement of a rail transit long-span continuous beam bridge on dynamic characteristics of tracks

doi: 10.12299/jsues.24-0370
  • Received Date: 2024-12-10
  • Publish Date: 2026-09-30
  • To address the problem of pier reinforcement for a bridge span whose midspan deflection had not converged, the displacement and vibration states of the track structure on the upper line were monitored. A monitoring method was proposed that covered rail displacement and vibration, switch rail closure state, and bearing block vibration. The time-domain variation rules of the monitoring data before and after pier reinforcement were discussed, and the influence of the reinforcement construction on the in-service behavior of the track was evaluated. The results show that the subway bridge reinforcement scheme of adding pier columns at midspan and applying an additional jacking force of 200 t can effectively improve the stability of the track bed and rails. Under train operation conditions, the dynamic displacement of the rails is significantly reduced and the stiffness of the track structure is enhanced, but the vibration amplitudes of the rails and the track bed increase to a certain extent. It is suggested that in future reinforcement projects of similar rail transit long-span continuous beam bridges, on-site monitoring be adopted to manage the service state of the track during construction.
  • loading
  • [1]
    翟婉明, 赵春发. 现代轨道交通工程科技前沿与挑战[J] . 西南交通大学学报, 2016, 51(2): 209 − 226.
    [2]
    陶文彬. 上海地铁11号线列车运行模式丢失故障分析[J] . 交通与运输, 2021, 37(1): 43 − 46.
    [3]
    刘能文, 王益, 秦永刚. 城市复杂交通状况下典型桥梁加固方案分析与选择[J] . 市政技术, 2022, 40(9): 103 − 109.
    [4]
    徐孝辉. 基于模糊层次分析法的桥梁加固方案比选研究[J] . 施工技术(中英文), 2022, 51(15): 16 − 19. doi: 10.7672/sgjs2022150016
    [5]
    王艳, 刘哲, 周瑞娇, 等. 基于车桥耦合振动分析的大跨径曲弦桁梁桥加固方案评价研究[J] . 振动与冲击, 2022, 41(14): 199 − 209. doi: 10.13465/j.cnki.jvs.2022.14.027
    [6]
    孔令楠, 郝伟. 基于博弈论和证据理论的桥梁加固方案优选研究[J] . 铁道科学与工程学报, 2020, 17(3): 556 − 562.
    [7]
    周华威, 汪志春, 朱慈祥, 等. 运营桥梁抬桩加固沉降分析及监测技术[C] //中国公路学会养护与管理分会第八届学术年会论文集. 厦门: 中国公路学会养护与管理分会, 2018: 61 − 69.
    [8]
    赵庆云, 张运清, 孟涛, 等. 基于不中断交通伴随监测的桥梁加固评价研究[J] . 公路, 2019, 64(5): 79 − 83.
    [9]
    王俊博, 金耀, 陈文礼, 等. 基于自动化监测系统的某大跨度悬索桥维修加固分析评价研究[J] . 公路, 2024, 69(1): 145 − 150.
    [10]
    Zampieri P, Piazzon R, Niero L, et al. Damaged masonry arch bridges strengthened with external post-tensioning: experimental and numerical results[J] . Engineering Structures, 2024, 318: 117929. doi: 10.1016/j.engstruct.2024.117929
    [11]
    Yang J, Yang C Q, Zhang Y, et al. Safety monitoring and effect evaluation of variable cross-section continuous box-girder bridges strengthened with external Prestressing[J] . Journal of Performance of Constructed Facilities, 2023, 37(2): 04022082. doi: 10.1061/JPCFEV.CFENG-4272
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(6)  / Tables(5)

    Article Metrics

    Article views (48) PDF downloads(16) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return