THE MARKOV METHOD OF ANALYSING PROJECT CONTRACTING RISKWELDING DATABASE AND WELDING PROCEDURE QUALIFICATION SYSTEM[J]. Journal of Shanghai University of Engineering Science, 2001, 15(2): 117-122. doi: 10.3969/j.issn.1009-444X.2001.02.008
Citation:
THE MARKOV METHOD OF ANALYSING PROJECT CONTRACTING RISKWELDING DATABASE AND WELDING PROCEDURE QUALIFICATION SYSTEM[J]. Journal of Shanghai University of Engineering Science, 2001, 15(2): 117-122. doi: 10.3969/j.issn.1009-444X.2001.02.008
THE MARKOV METHOD OF ANALYSING PROJECT CONTRACTING RISKWELDING DATABASE AND WELDING PROCEDURE QUALIFICATION SYSTEM[J]. Journal of Shanghai University of Engineering Science, 2001, 15(2): 117-122. doi: 10.3969/j.issn.1009-444X.2001.02.008
Citation:
THE MARKOV METHOD OF ANALYSING PROJECT CONTRACTING RISKWELDING DATABASE AND WELDING PROCEDURE QUALIFICATION SYSTEM[J]. Journal of Shanghai University of Engineering Science, 2001, 15(2): 117-122. doi: 10.3969/j.issn.1009-444X.2001.02.008